FS#1335 — FS#5336 — UPS 3 RBX2

Attached to Project— Datacenters
Incident
Roubaix 2
CLOSED
100%
The UPS 3 at RBX 2 is in default due to the fact that one of the power modules is out of service.
A technician is on the site, soon joined by another one in order to replace the necessary pieces.

The UPS is in by-pass mode now.
Date:  Tuesday, 03 May 2011, 15:36PM
Reason for closing:  Done
Comment by OVH - Tuesday, 12 April 2011, 21:15PM

The intervention is still in progress.

The pieces of the inverter that are "easy to replace"
are not the cause.

The technician looks currently for a default on the
SELF of the inverter.

The working goes on tonight.


Comment by OVH - Friday, 15 April 2011, 13:59PM

The manufacturer declared the module 1 of this UPS as unrepairable .
They haven't found the cause of the failure.

We will try to restart this afternoon on the module 2 alone by
offloading some of the load.


Comment by OVH - Thursday, 21 April 2011, 17:50PM

The manufacturer wants to replace the entire UPS.

We have developed a procedure to replace the UPS completely
without interruption. Since Friday, a new UPS has been temporarily put in place
and wired to replace "hot" UPS 3 RBX2.

We start the construction phase:
- Should be set all / re-wiring of the UPS batteries
- Start in parallel
- Cutting off the old UPS


Comment by OVH - Tuesday, 26 April 2011, 11:57AM

Since Thursday 21/04, the load was switched the temporary UPS (without any cut off).
Our electrician team proceed to the replacement of the device which is out of service.


Comment by OVH - Tuesday, 03 May 2011, 11:03AM

The UPS which is out of service was replaced with a new one.

The manufacturer is on the spot in order to realise the switch of the load
of the old UPS to the new one together with our technicians.


Comment by OVH - Tuesday, 03 May 2011, 15:36PM

The new UPS is operational with the load. No cut off was realised
for the complete replacement of the UPS.

End of the tasks on UPS 3.