rbx6-106-n56-vrack
Scheduled Maintenance Report for Network & Infrastructure
Completed
We will update the nexus to version NXOS 7.1.4N1 on March 5, 2017, starting at 12:00 am (GMT +1). This will require a reboot of the switch so there will be a \"flap\" of the vRack network link for the following racks:

RBX3/6:
46G05
46G07
46M04
46M05
46M06
46M07
46M08
46G08
46M09
46M01
46M02
46M03
46G09
46G10
46G11
46G12
46G13
46H12
46G29

The flap will last no longer than 30 minutes.


Update(s):

Date: 2017-03-05 00:37:05 UTC
Update done, all is back to normal.

Date: 2017-03-05 00:34:35 UTC
The reload has been done and update is in progress.