Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
The 27th of July around 00:00 (UTC), we are going to work on this equipment:
1. Swap of the line one by one to avoid the issue regarding an item on the linecard
2. Replacing the failure fabric (http://travaux.ovh.net/?do=details&id=25945)
No impact is planned, we will isolate the router before the tasks
Update(s):
Date: 2017-07-27 02:19:52 UTC Both linecard are up and running. We put back the router in production.
Date: 2017-07-27 01:15:42 UTC Done.
The Fabric card (+ upgrade FPD) and the linecards have been swapped. We put back in production the router and we are going to swap the linecard on sbg-g2-nc5
Date: 2017-07-27 00:07:04 UTC The backbone router is isolated, all the traffic of Strasbourg datacenters in routed via sbg-g2-nc5. We are going to swap the linecards.
Date: 2017-07-27 00:00:29 UTC We are starting with sbg-g1-nc5. We isolate it of the network.