FS#15281 — CHI <> PAO
Attached to Project— Network
Planned Work | |
Backbone US | |
CLOSED | |
![]() |
Our provider has planned a maintenance on one of our 100 G link 100G links between Chicago and Palo Alto.
In order to avoid disturbances and preserve the quality of service we will isolate the link during the maintenance period. The traffic will flow via LAX <> ASH links. We will eventually isolate peerings on the west coast if the traffic is too important to avoid the saturation of the LAX <> ASH links.
Start of maintenance: 2018-01-23 10:00:00 UTC
End of maintenance: 2018-01-23 13:00:00 UTC
Impact: Slight increase in latency
Weathermap Backbone US: http://weathermap.ovh.net/#usa
Date: Tuesday, 23 January 2018, 14:12PMIn order to avoid disturbances and preserve the quality of service we will isolate the link during the maintenance period. The traffic will flow via LAX <> ASH links. We will eventually isolate peerings on the west coast if the traffic is too important to avoid the saturation of the LAX <> ASH links.
Start of maintenance: 2018-01-23 10:00:00 UTC
End of maintenance: 2018-01-23 13:00:00 UTC
Impact: Slight increase in latency
Weathermap Backbone US: http://weathermap.ovh.net/#usa
Reason for closing: Done
We are now going to isolate the links.
Links are now isolated, they will be put back in production when the maintenance ends (expected at 13:00 UTC).
Maintenance is over, links are back in production.