FS#2017 — FS#5992 — Lille loop 3 (SAN59,WAS59, RON59, TOU59, RSA59, STM59) - 25/10/11

Attached to Project— ADSL / SDSL
Maintenance
Backend / Core
CLOSED
100%
We will intervene on the loop 3 for the security works(same as what has been done on the Loop 1 and 2, see task # 5763 and task # 5909).
This involves moving DSLAMs uplinks to a new transportation equipment. So there will be a service cut off on each successive NRA that we will try to minimize as much as we can.
We planned a maintenance window of 1 hour by NRA. Works will begin around 22:00.
The NRAs will be impacted in the following order: SAN59, WAS59, RON59, RSA59, STM59.

We will work tonight on the NRAs: SAN59, WAS59 and RON59.
Date:  Saturday, 29 October 2011, 08:09AM
Reason for closing:  Done
Comment by OVH - Wednesday, 26 October 2011, 00:30AM

We are preparing the switching of SAN59.


Comment by OVH - Wednesday, 26 October 2011, 00:31AM

SAN59 switched,we are preparing WAS59.


Comment by OVH - Wednesday, 26 October 2011, 02:06AM

WAS59 switched.


Comment by OVH - Wednesday, 26 October 2011, 02:16AM

We had too much attenuation between RON and SAN,which prevents us to setup the link under normal conditions. We postponed RON59 failover to the next maintenance on Thursday.


Comment by OVH - Friday, 28 October 2011, 14:01PM

We go back to work.We have fixed a problem of wiring on WAS59.We are working on RON59 to prepare the switch.


Comment by OVH - Friday, 28 October 2011, 14:01PM

RON59 switched.We prepare TOU59


Comment by OVH - Friday, 28 October 2011, 14:02PM

Switching of TOU59 in progress.


Comment by OVH - Friday, 28 October 2011, 14:13PM

We have met difficulties in TOU59. The port of one transport equipment was defective in Roubaix. We have moved the link to another port. The DSLAM is back online. We attack the RSA switch.


Comment by OVH - Friday, 28 October 2011, 14:16PM

RSA switched,We move to STM.last NRA in loop.


Comment by OVH - Friday, 28 October 2011, 14:17PM

STM switched.We activate the security links to the pop2.


Comment by OVH - Friday, 28 October 2011, 14:20PM

The security on pop2 is active. The loop 3 is ... fastened.