OVHcloud Network Status

Current status
Legend
  • Operational
  • Degraded performance
  • Partial Outage
  • Major Outage
  • Under maintenance
FS#6675 — BHS Network
Scheduled Maintenance Report for Network & Infrastructure
Completed
We are cutting the optical fibre ensuring the DC BHS connection to Montreal. The goal is to end the tasks of the passing fibre, properly.
The connection will be ensured by a 10G independent backup.


Update(s):

Date: 2012-05-05 00:19:52 UTC
The optical fibre has been cut. Links are up. We are checking the optical loss.

We will run over the traffic on the main links.

It was perfectly done.



Date: 2012-05-05 00:17:03 UTC
We are on the backup. We are reactivating the main links with less priority

Done. We are ready to work.


Date: 2012-05-05 00:15:51 UTC
5 seconds of cut-off. we are on the backup link

Last 74 pings
1. p19-55-6k.fr.eu .......??????...............................?..............???..???.??....
2. p19-7-6k.fr.eu ..?....?...??......?..?......?.....????.?.....?.?..?..??...??......?..????
3. th2-g1-a9.fr.eu ..........................................................................
4. rbx-g2-a9.fr.eu ..........................................................................
5. ldn-5-6.uk.eu ...?...?.......???.??............?.......?....?......................?..?.
6. nwk-2-6k.nj.us ...............?..........?......?.................?......??????..........
7. mtl-2-6k.qc.ca .....................................................>....??????......????
8. bhs-1-6k.qc.ca ......................................?....?..>.....??...????????.>.......

Scale: .:6 ms 1:16 ms 2:25 ms 3:47 ms a:104 ms b:158 ms c:253 ms


Date: 2012-05-05 00:14:34 UTC
We are going to test the backup then cut the connection on the routers afterwards.
Posted May 05, 2012 - 00:12 UTC