OVHcloud Network Status

Current status
Legend
  • Operational
  • Degraded performance
  • Partial Outage
  • Major Outage
  • Under maintenance
FS#4413 — Electric switch at halls 20 et 25
Scheduled Maintenance Report for Network & Infrastructure
Completed
On 27 Tuesday night until 28 July, between midnight and 4 in the morning, we are going to modify the electric distribution of HG halls at Roubaix 2.

Halls 20 and 25 (racks servers 25XXX + OVH equipments) are going to be electrically switched \"to hot\", means without disconnection nor reboot (thanks to line system A / line B, even for customers whose not having problem to double-alimentation of their server).


Update(s):

Date: 2010-07-28 23:52:47 UTC
Hall 25 has been reset in double-alimentation.
We disconnected the alimentation rescue in hall 20.

Electricians are dealing with hall 20.


Date: 2010-07-28 23:50:32 UTC
The hall 25 runs actually on a single line.
Electricians are intervening.



Date: 2010-07-28 23:49:32 UTC
We are starting the switch in hall 25.
Posted Jul 28, 2010 - 23:48 UTC