Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
We are intervening on the fiber link Roubaix<>London in order to prepare the upgrade to 100G on the optical link. The 1st step is to replace the BMMs cards on our INFINERA equipments in Roubaix and London. The operation starts at midnight. We are expecting a 20min impact on the traffic UK/US during the intervention.
Update(s):
Date: 2013-01-23 03:47:06 UTC The last OCG was mounted. All 10G links Roubaix<>London were restored.
Date: 2013-01-23 03:46:41 UTC Works continue, we still have a problem with this last OCG.
Date: 2013-01-23 00:26:12 UTC 2 of 3 OCGs were already remounted, we recovered 2/3 the capacity to London.
We have to fix a cable issue on the last OCG from Roubaix's side.
Date: 2013-01-23 00:24:00 UTC We replaced the cards BMM-4 by BMM2-8.
We remounted the different OCGs (groups of 10 lambdas 10G).
Date: 2013-01-23 00:22:18 UTC We started the intervention.