FS#7980 — Backbone London works - 30-31/01
Scheduled Maintenance Report for Network & Infrastructure
Completed
We will move routers ldn-1-6 and ldn-5-6k on Telehouse London to a new space in the new building West. We will also switch the 10G links between London and Roubaix on new equipment in 100G Infinera (chassis DTN-X).
The work will take place the night separating 30 to 31/01 starting from 00:00 CEST, 11pm local time.

Update(s):

Date: 2013-01-31 04:52:42 UTC
Both routers were permanently moved to the rack.

Date: 2013-01-31 04:52:16 UTC
The router ldn-5-6k is on and pings.

Date: 2013-01-31 04:51:49 UTC
the router ldn-5-6k is off.

We are moving the chassis.

Date: 2013-01-31 04:51:06 UTC
Router isolated.
We will begin disconnecting the fibers.

Date: 2013-01-31 04:50:43 UTC
All links are reconnected to ldn-1-6k.

We are isolating ldn-5-6k from the network.

Date: 2013-01-31 04:48:43 UTC
The router is on.

Date: 2013-01-31 04:48:25 UTC
We are linking the ports between ldn-1-6k and rbx-g1-a9 through new equipment in 100G Infinera (chassis DTN-X).


Date: 2013-01-31 04:35:36 UTC
The router is turned off.

We are moving the chassis in the room of the new building TELEHOUSE West.

Date: 2013-01-31 04:34:39 UTC
Router isolated.
We will begin disconnecting the fibers.

Date: 2013-01-31 04:33:55 UTC
We started isolating the router ldn-1-6k from the network.