We are going to update the Canada switch port configuration to reduce the impact of DoS attacks on the servers connected to these switches.
The intervention will commence on Monday June 10th at 9:30am Montreal time (15:30 in FR).
A few seconds of downtime are expected on the servers connected to these switches that we intervene on.
We will start with the switch ports corresponding to the server range 192.95.24.0.1-48.
Date: 2013-06-13 13:57:32 UTC We are starting on:
198.27.64.0/24
198.27.65.0/24
198.27.66.0/24
198.27.67.0/24
198.27.68.0/24
198.27.69.0/24
198.27.70.0/24
198.27.71.0/24
Date: 2013-06-12 16:16:47 UTC Done, we will move onto the following networks tomorrow from 3pm:
Date: 2013-06-12 14:34:54 UTC Today we are moving onto:
192.95.25.0/24
192.95.26.0/24
192.95.27.0/24
Date: 2013-06-11 14:52:52 UTC Done for today, we will continue at the same time tomorrow
with the following networks:
192.95.25.0/24
192.95.26.0/24
192.95.27.0/24
Date: 2013-06-11 13:39:08 UTC We are starting again with the rest of network 192.95.24.0/24
Date: 2013-06-10 14:11:07 UTC Done for today, we will continue with the rest of the 192.95.24.0/24 network at the same time tomorrow.
Date: 2013-06-10 13:55:49 UTC We are starting the operation on switch connected to the servers range of ip 192.95.24.1-48.