FS#587 — FS#4637 — Roubaix 1: electrical switching on generators.

Attached to Project— Datacenters
Maintenance
Roubaix 1
CLOSED
100%
In order to connect the rescue cable of our new source post
of Roubaix 2, EDF needs that we liberate a part of our installations
of Roubaix 1 and 3 (cabling in an EDF cell, then an obligatory
interruption of right and left cells via an internal EDF procedure).

The liberation of Roubaix 1 and 3 will take place on the morning of Tuesday, the 28th of September, 2010.

Meanwhile, the data centre will be powered by the Generators.
EDF also ensures a relief during this manipulation with a possible
return on the EDF network feasible in minutes.
Date:  Tuesday, 28 September 2010, 13:02PM
Reason for closing:  Done
Additional comments about closing:  We are back to the EDF network. The maintenance tasks were finished.
Comment by OVH - Tuesday, 28 September 2010, 10:57AM

We will switch the load to the generators.


Comment by OVH - Tuesday, 28 September 2010, 11:00AM

We are currently turning on the generators.
In a few minutes, ERDF will isolate us from the network.


Comment by OVH - Tuesday, 28 September 2010, 11:01AM

ERDF has finished the manoeuvres.
We will switch again on the EDF network.