FS#5003 — RBX 1 : 20'000 V source switch
Incident Report for Network & Infrastructure
Resolved
Yesterday at 17,30 the datacenter of Roubaix 1 switched on
inverters after a default on the main 20'000 V line.

After that, we done the return manoeuvers on the \"rescue\" way
of EDF, waiting that EDF repare the defaults.


The return on the \"normal\" way will be done this afternoon with EDF.

The EDF source switch and the switch on inverters has no impact
in the datacenter.


Update(s):

Date: 2011-01-08 13:53:14 UTC
The return to the normal scheme was done.

Date: 2011-01-08 13:50:30 UTC
EDF took a long time to repare the problems that seem to be important.

We have a meeting at 12 O'clock to make the normal way back
and consequently have again the EDF rescue in case of new interruption.

The technician is on the spot to do the reparation.
Posted Jan 07, 2011 - 13:05 UTC