We are starting a migration on the Roubaix1 network in order to modernise the infrastructure. It will involve replacing aggregation switches and routers from the current infrastructure that has existed since the datacentre started operating. This will enable us to improve reliability and introduce new services.
Update(s):
Date: 2014-12-03 15:53:20 UTC We migrated all customers networks. This work task is now completed.
Date: 2014-11-19 13:33:10 UTC we are going to migrate the following networks:
Date: 2014-08-08 16:03:01 UTC The below networks are now mograted to the new infrastructure:
91.121.82.0/24
91.121.83.0/24
We can therefore get rid of a catOS.
Date: 2014-08-04 15:34:03 UTC The below networks are now migrated to the new infrastructure:
91.121.76.0/24
91.121.77.0/24
91.121.79.0/24
-> 2 fewer catOS in RBX1!
Date: 2014-08-04 15:28:49 UTC done for:
91.121.72.0/24
91.121.73.0/24
91.121.75.0/24
We will continue with:
91.121.76.0/24
91.121.77.0/24
91.121.79.0/24
Date: 2014-08-04 14:30:56 UTC We are resuming migrations.
List of networks planned for today:
91.121.72.0/24
91.121.73.0/24
91.121.75.0/24
Date: 2014-08-01 16:41:12 UTC done:
91.121.74.0/24
91.121.78.0/24
91.121.80.0/24
91.121.81.0/24
will be migrated later:
91.121.82.0/24
91.121.83.0/24
Date: 2014-08-01 15:45:46 UTC Networks currently being migrated:
91.121.74.0/24
91.121.78.0/24
91.121.80.0/24
91.121.81.0/24
91.121.82.0/24
91.121.83.0/24
Date: 2014-07-29 10:58:22 UTC We're continuing with migration.
List of networks planned for today:
- 91.121.4.0/24 à 91.121.7/24
- 91.121.68.0/24 à 91.121.71.0/24
- 91.121.72.0/24 à 91.121.75.0/24
Date: 2014-07-28 14:38:18 UTC The issue has been resolved. It was a configuration issue on the new infrastructure. We will stop the migration there for today.
Status:
- from 91.121.0.0/24 to 91.121.7.0/24: done up to 91.121.3, will resume tomorrow for the following networks
- from 91.121.16.0/24 to 91.121.23.0/24: done
- from 91.121.28.0/24 to 91.121.31.0/24: done
Date: 2014-07-28 14:35:37 UTC There is a problem related to the migration with network 91.121.23. We will investigate.
Date: 2014-07-28 13:17:44 UTC We will continue the migration on networks 91.121.16 to 23.
Status:
- from 91.121.0.0/24 to 91.121.7.0/24: done up to 91.121.3, will resume tomorrow for the following networks
- from 91.121.16.0/24 to 91.121.23.0/24: in progress
- from 91.121.28.0/24 to 91.121.31.0/24: done
Date: 2014-07-28 12:54:17 UTC The network 91.121.1 issue has been resolved. We're continuing with the migration.
Date: 2014-07-28 12:51:32 UTC Status of progress:
- 91.121.28.0/24 à 91.121.31.0/24: done
- 91.121.0.0/24 à 91.121.7.0/24: in progress
We have a cable issue on one of the switches in network 91.121.1 and 30 machines are currently down in this network.
We're currently using a temporary cable to reestablish connection asap.
Date: 2014-07-28 10:43:24 UTC The first stage of the migration is complete and the first 4 routers of the old infrastructure are already removed from production. We will continue with the migration today on the following networks:
de 91.121.0.0/24 à 91.121.7.0/24
de 91.121.16.0/24 à 91.121.23.0/24
de 91.121.28.0/24 à 91.121.31.0/24
Date: 2014-07-25 15:22:13 UTC We will now intervene in networks 91.121.64 to 91.121.67.
Date: 2014-07-25 15:21:47 UTC We will intervene in networks 91.121.24 to 91.121.27.
Date: 2014-07-25 10:44:58 UTC We will intervene in networks 91.121.9 and 10.
Date: 2014-07-24 16:54:19 UTC After migrating the first network, we've decided to not do any more today to improve our process. This should enable us to reduce the downtime on the FO IPs and avoid any edge effects on the vRack infrastructure. Work will recommence tomorrow morning.
Date: 2014-07-24 13:24:21 UTC We're intervening in network 91.121.8.